New stay cable bridge crosses the river IjsselThe new 381 m long "EILANDBRUG" Bridge near Kampen, NetherlandsThe "EILANDBRUG" stay cable bridge crosses the IJssel river in a new section of the N50 motorway near the city of Kampen. The total length of the bridge is 381 m,the pylon is 93.5 m high and the main span is 150 m long and 20 m wide. The subcontractor was a joint venture of Hegeman Nijverdal B.V. and Strukton Betonbouw B.V., responsible for the civil part of the project. | |
Approach Bridges and Bascule BridgeThe north and south concrete approaches are 91 and 130 m long, respectively. Thanks to a combination of high strength concrete class B65 that incorporated 0.9 m weight reducing tubes, and the 13 strand longitudinal DYWIDAG Post-Tensioning Tendons, it was possible to achieve very light and slender sections with a total thickness of only 1.25 m. The approach bridges were erected between August 2001 and March 2002. | PylonThe pylon legs and the main transverse girder at the deck level were built using class B65 high strength concrete with massive cross sections. Starting from the deck level at 21 m, special climbing scaffolding was used for erection complete sections of pylon legs. The pylon was erected prior to the main span and it was necessary to use temporary supports for the inclined pylon legs at the level of 58 m. At the top a transverse wall joins the legs of the pylon. The stay cable anchorages are located here. The lower anchorages of the back stays are located at the deck of the ballast caisson at the north end of the bridge. During the erection of the main span the ballast in the caisson had to be increased proportionally in order to keep the pylon in balance. |
Main SpanThe main span of the bridge is designed as a composite steel-concrete structure. The deck was erected incrementally by using 14.5 m long and 20.0 m wide prefabricated bridge sections.
| During the erection of the main span the back stay cables were installed and stressed. After installing and stressing of the first pair of back stay cables the temporary support of pylon legs were removed. The 3rd stressing was carried out on all stay cables after the last section of the main span was completed and the final 4th stressing phase was completed after the asphalt overlay was placed on the deck. DYNA Grip Stay CablesThe main span is suspended on 2 x 9 = 18 stay cables. The shortest stay cables are about 68 m long and consist of 28 strands; the longest are approximately 165 m in length and consist of 46 strands. The back stay cables (2 x 3 =6) are approx. 106 m long and consist of 86 strands each. DYNA Grip Cables with anchorages type C37,C55 and C91 were used in this structure. |