Memorial Wall at Ground Zero inaugurated September 11th 2011
GEWI® Piles stabilize Important Motorway Connection in the Netherlands
GEWI® Plus Tie Bars Support Crucial Retaining Walls after Tunnel Collapse
GEWI® Piles used for Important Train Connection from Munich to Verona
Vienna’s new Central Station: DSI Austria contributes to Increased Mobility
Attractive Center for UNESCO World Heritage Site: Quartier 17, Stralsund
FLIMU System Convinces by Cost Effectiveness: Mittlerer Ring, Munich, Germany
DYWIDAG Strand Anchors Stabilize Baden-Wuerttemberg’s Largest Road Construction Project
1,730 DYWIDAG Strand Anchors stabilize Slurry Wall at the New S8 Express Road in Poland
Large-scale Project in Baltimore’s Inner Harbor: DSI stabilizes Excavation at Inland Port
New research center ("South Campus Research Facility") at the Children’s Hospital in Philadelphia, PA, USA
Construction of a new football stadium in Arlington, Texas, USA
Fabric Tubes by DSI Used for Bridge Foundation
DYWIDAG T76S Hollow Bars Stabilise Limerick Casting Basin, Ireland
Difficult Excavation Stabilized Using Flexible DYWIDAG Geotechnical Systems
Sandy Mississippi Bluffs Turned into Quai Wall Using DYWI® Drill Hollow Bar Anchors
Excavation Support and Post-Tensioning for a Parking Structure Using DYWIDAG Systems
Citytunnel Project, Malmö, Sweden
A-LAXE Shopping Center in the harbor of Vigo, Galicia, Spain
First-time use of the DYWI® Drill Hollow Bar System for a jet grouting application in Italy
Excavation for the underground line from Ládvi to Letnany, Prague
Shoring for reconstruction of Little Mountain Reservoir using DYWI® Drill Hollow Bars
DYWI® Drill System secures Trough Structure for Railroad, Reno
Deep excavation retaining wall supported by double corrosion protected anchors
The Reno ReTRAC (Reno Transportation Rail Access Corridor)
DYWIDAG Fiberglass Soil Nails proved to be the best solution for Harbor Landing excavation
DYWIDAG Technology secures the retaining wall of an important parking structure in Los Angeles
Large shoring project in North America using DYWI® Drill Hollow Bars
DYWIDAG strand anchors installed in an impressive excavation project
The New Garden of Eden built with DYWIDAG Rock Bolts and Ground Anchors
DYWIDAG GEWI® Piles stabilize major Scottish railway realignment
Parking garage expansion, Wasserburg at River Inn, Germany
Berlin's Foundation Engineering Projects
Excavation of parking garage in Giggijoch, Soelden, Austria
DSI Permanent Soil Nails stabilize excavation of the new Stanley Hall
DCP Bar Anchors secure stage foundations of the Teatro alla Scala
Shotcrete excavation wall secured with DYWI® Drill Hollow Bars