Downloads read more ...
Brochure Repair and Strengthening,
Filesize: 546 kB
Filesize: 546 kB
References read more ...

Modification / expansion of existing structures
Grandhotel Taschenbergpalais Kempinski, Dresden, Germany
Built between 1707 and 1711, and completely destroyed by fire in 1945, this baroque palace is now the site of a luxury hotel. During the construction of a 4-storey underground garage, the existing south façade, with a total weight of approx.
1,000 t, had to be supported 18 m above the foundation level. GEWI ® Bars with various diameters were used as tensioning and securing members. For the
deep foundation of the western wing of the palace, GEWI ® Piles were drilled through the old cellar. The bond length of the piles is between 7 and 12m.

