The Gerald Desmond Bridge: DYWIDAG Strand Tendons for the USA’s second highest Stay Cable Bridge

Currently, the 1968 Gerald Desmond Bridge that crosses the Back Channel in the Port of Long Beach, California, is being replaced by a new stay cable bridge. The bridge is an important connection to the city center. Thanks to a 62.5m (205ft) clearance, the bridge is also suitable for large cargo ships. The two pylons are approx. 157m (515ft) high, and, once completed, the new Gerald Desmond Bridge will be the USA’s second highest stay cable bridge. The bridge deck has a 610m (2,000ft) long main span and is supported by 40 stay cables at each of the two pylons.

DSI USA is producing and supplying the complete longitudinal and transverse post-tensioning for the entire bridge deck and the approach structures.

In total, over 3,000t of bonded DYWIDAG Strand Tendons of different Types ranging from 4-0.6" to 37-0.6" with MA Anchorages will be installed in the bridge. The scope also includes the installation of all anchorages, duct and strand as well as stressing and grouting.

For the high-level approach structures that are being built using the incremental launching method with Movable ScaffoldingSystems (MSS), DSI is also installing the strand tendons and performing the stressing and grouting operations as well as the complete installation of the transverse deck post-tensioning.

When using the incremental launching method, stressing operations follow concrete placement by just 48 hours. Therefore, the equipment must be provided just-in-time in order to ensure the completion of the stressing and grouting work within the tight launch schedule.

The typical spans are constructed using 4 to 5 Type 27-0.6" DYWIDAG Strand Tendons, running full-length in each girder web. Additional, part-length, typically Type 27-0.6" or 37-0.6" DYWIDAG Strand Tendons pass longitudinally through the top deck. The top decks are transversely post-tensioned using Type 4-0.6" DYWIDAG Strand Tendons in flat ducts with Type FA Flat Anchorages. Several structures feature part-length DYWIDAG Strand Tendons that necessitated stressing from the interior of the box girder. This requires close collaboration with the contractor.

Cast-on-falsework construction is common in the western USA, and DSI is one of the most experienced subcontractors in this market. The extensive experience of DSI’s field crews ensures a safe and efficient installation within the tight schedule.

Thanks to the fact that DSI’s Long Beach facility is located at a distance of only 16km (10mi) from the jobsite, DSI is able to rapidly respond to the contractor’s changing needs at all times in this major project. Furthermore, due to the wide array of available equipment, DSI is able to supply the matching equipment to the jobsite at all times without any delays. The continuous coordination between multiplework locations on the project site as well as the Long Beach plant ensures a seamless flow of materials, equipment and manpower.

Owner

Port of Long Beach und California Department of Transportation (Caltrans), both USA

Design/Build Contractor

SFI Joint Venture, consisting of Shimmick Construction Inc., USA, FCC Construction, Spain and Impregilo S.p.A., Italy

Architect

HNTB, USA

Consulting Engineers

Arup Pty. Ltd. and Biggs Cardosa Associates, Inc., both USA


Subcontractor

DYWIDAG-Systems International USA Inc., BU Post-Tensioning, West, USA

Scope

Production, supply, installation

Products

over 3,000t of Type 4-0.6" to 37-0.6" DYWIDAG Strand Tendons with MA Anchorages